PRIVATE COMMISSION — FOR AARON — GRANVILLE, OHIO — SUMMER 2026 — SECOND STUDY

around the fire

THE ESSENTIAL GARDEN — TOLD AS ONE EVENING

most proposals tell you what a project costs. this one tells you what a tuesday night will feel like — from the last of the light to the last of the logs.

YOUR COURTYARD, TWELVE WEEKS FROM NOW — LIVING PHOTOGRAPH
5:47 pm

NO. 01 — THE BACK DOOR

it's a tuesday in june, two summers from now. you step out the barn doors with a cup of coffee you have no intention of finishing, and the ground under your feet is soft.

that's the whole project. everything else on these pages is just how we get you there.

the first study dreamed in water and cedar — a beautiful dream, and an expensive one. when we sat with it, the part you kept returning to was never the swimming. it was the sitting. the chairs pulled close. the field going dark behind the fence.

so we kept that part, and let the rest go.

grass where the gravel is. stone set loose into the grass. deep borders along the fences you already own. and at the far end, where the evening gathers anyway — a fire.

no pool excavation. no pool plumbing. no season of heavy construction. the revised garden requires limited grading, gravel haul-off, one week of compact equipment, stone, planting, low-voltage light, and one steel bowl.

less to build. nothing less to love.

places that feel as though they have always belonged.

6:04 pm

NO. 02 — THE COURTYARD, TWICE

STUDY № 1 — FROM THE BARN DOORS

drag to compare. the exact yard, the exact light, the exact sky — we changed nothing we didn't have to.

After — lawn, bluestone and borders where the gravel is, the fire terrace at the far end
Before — the gravel courtyard as it stands today
BEFORE
AFTER
THE HONEST LEDGER

what stayed, and what went. we'd rather show you this page than bury it.

Kept

  • the lawn, holding the whole court
  • bluestone set loose into the grass
  • deep borders — hydrangea, catmint, grasses
  • the square fire terrace, and the fire
  • low warm light, hidden in the planting
  • every reason to stay outside

Let Go

  • the plunge pool
  • the sauna build-out
  • the pool excavation and its plumbing
  • a season of heavy construction
  • the number at the bottom of the last page

a fraction of the first study's estimate — and it keeps the hour you'd have used most.

6:41 pm

NO. 03 — EIGHT WEEKS, IN ONE SCROLL

KEEP SCROLLING — WATCH IT BUILT
7:18 pm

NO. 04 — THE WALK

dinner's done. you walk the garden the long way, because now there is a long way.

The LawnGRASS WHERE GRAVEL IS

two thousand square feet of tall fescue where the gravel rattles today — the court measures sixty-seven feet by forty-three. it is the single biggest change on the property and the simplest one — the eye reads it in half a second: this is a garden now, not a work yard.

graded, amended, sodded, and mown in one long stripe toward the field.

The StoneBLUESTONE, SET LOOSE

thirty-odd slabs of thermal bluestone bedded flush into the lawn in a loose grid — a path that never tells you where to walk, it just makes sure you're never wrong. barefoot from the french doors to the fire, even in august, even in the dew.

two-inch stock on grit beds. the grass knits the joints by the second season.

The BordersHYDRANGEA · CATMINT · GRASSES

deep perennial borders down the fence lines — white hydrangea glowing against the dark grapevines, catmint and salvia weaving blue through the middle, feather reed grass catching whatever light is left. loose, layered, a little undone on purpose.

the boxwood stays. the espaliered vines stay. they were always the best thing here — we're just giving them an audience. low-voltage lights tuck into the mulch, invisible at noon, quietly on duty by nine.

The FireFOURTEEN FEET OF GRAVEL, KEPT ON PURPOSE

at the far end, a square terrace of bluestone, its joints filled with grey river stone — the old court distilled into one quiet stone room. a corten steel bowl at its center, low teak sofas around it, the field at your back. from that seat you face everything you own: the lawn, the borders, the barn lit from inside.

it is the last place occupied every single night. long after dinner. long after the mosquitoes give up. the room the whole garden was built around.

8:12 pm

NO. 05 — THE SEAT WITH THE LONG VIEW

STUDY № 2 — FROM THE FIRE, TOWARD THE BARN

the view from the chair you'll claim as yours. drag to compare.

After — the fire terrace in the foreground, lawn and stepping slabs running back to the barn
Before — the gravel courtyard looking toward the barn as it stands today
BEFORE
AFTER

a pool is for august.
a fire is for every month of the year.

WHY THE FIRE WON
The fire terrace up close — corten bowl, low teak sofas, the new lawn beyond
THE FIRE TERRACE — DETAIL, FROM STUDY № 2
8:52 pm

NO. 06 — SUNSET, SCROLLED

The garden by day
KEEP SCROLLING — DAY BECOMES NIGHT
9:34 pm

NO. 07 — WHAT IT'S MADE OF

BUILT TO AGE WELL

nothing here is meant to look new for long. every material was chosen for how it weathers, because you'll live with year ten far longer than day one.

the steel darkens. the stone softens. the hydrangeas get embarrassing in the best way. the barn stays exactly the same.

9:58 pm

NO. 08 — THE YEAR, FROM ONE CHAIR

JANUARY

the fire doesn't know it's winter. snow on the chair arms, cocoa going cold, the barn glowing like a lantern across the white lawn.

APRIL

the catmint is up first. the lawn wakes in streaks, then all at once. the first fire without a coat.

JULY

hydrangeas the size of dinner plates. bare feet on warm bluestone. the long, slow evenings this whole thing was built for.

OCTOBER

the borders go copper and keep standing. sweaters come out, the sofas pull in closer. the fire's favorite month.

10:15 pm

NO. 09 — THE NUMBERS, BY FIRELIGHT

THE PROPOSED INVESTMENT

sixty-one five, complete. each figure below is an installed scope price — not a loose collection of material allowances. it includes the hands that build it, the equipment that moves it, the care that establishes it, and the responsibility that stays with us after the last chair is placed.

The investment — scope by scope: installed scope prices totaling $61,500
THE INVESTMENT — SCOPE BY SCOPE
site preparation, limited grading & haul-offstrip the 67' × 43' court; removal & lawful disposal of up to approximately thirty-five tons of existing gravel & unsuitable material — quantity confirmed at final measure $10,000
tall-fescue lawn — approx. 2,000 sq ftpremium sod, installed; soil preparation, rolling, initial watering guidance & one establishment inspection $7,500
thermal bluestone — approx. 300 sq ft2" slabs bedded on grit, set flush to mowing height $10,000
planted borders — approx. 480 sq fthydrangea, catmint, salvia & grasses, #2–#3 stock; mulched at a proper 2–3" depth & edged $8,500
fire terrace, bowl & seatingsquare bluestone terrace with grey river-stone joints & corten edge, fire bowl included; premium lounge & dining furniture shown is selected together & quoted separately at final measure $7,500
low-voltage lighting — 12 fixtures2700K path & wash lights, transformer, dusk-to-dawn control $5,500
equipment rental & transportfull-size skid steer & compact machinery held for the eight-week schedule; attachments, transport & fuel $4,000
design development, project management & approvalsdrawings, supplier coordination, zoning coordination & ordinary application fees $5,500
measured-quantity & site-condition contingencyan explicit, visible reserve — reconciled before the final agreement $3,000
total proposed investment $61,500

proposed investment: $61,500. the final construction agreement will be issued after the site measure, supplier confirmation, zoning review, and confirmation of the permitted fire-bowl type and location. once that agreement is signed, its confirmed scope will be fixed. no additional work or cost proceeds without written owner approval.

every known quantity is shown. measured quantities, defined allowances, and exclusions are confirmed before contract. extraordinary concealed conditions require written approval before additional work.

exterior modifications, grading, excavation, and filling are subject to village review. the project includes ordinary zoning coordination and application fees up to $500. a variance, architectural-review hearing, engineering study, utility relocation, or other extraordinary approval is excluded unless added by written agreement.

final fire-bowl placement and fuel type are subject to confirmation with the village and local fire authority. if a traditional wood fire is not permitted, the design will be adapted to an approved gas or smokeless alternative.

THE BUILD — EIGHT WEEKS, TWO PAIRS OF HANDS

no subs, no fleet. the two of us who designed it, start to finish.

i

Ground

WEEKS 1–3

strip the gravel court, regrade, bring in amended topsoil. the loudest this project will ever be.

ii

Stone

WEEKS 4–6

bluestone bedded and set flush to the new grade. the fire terrace paved, its joints dressed in grey river stone.

iii

Green

WEEK 7

sod down, borders planted, mulched and edged. the garden reads finished by friday afternoon.

iv

Light & Fire

WEEK 8

fixtures tucked into the planting, transformer wired, furniture placed. the first fire is lit with you on the sofa.

THE KEEPING — OPTIONAL

a garden this simple still deserves a keeper. we'd like it to be us.

weekly visits during active spring and fall growth, shifting to every ten to fourteen days during slower summer periods when conditions allow. border care, feeding, light checks, seasonal cutback, and fire-circle grooming follow the annual maintenance calendar.

never finished — it is kept.

the annual schedule and price will be provided
after the installation calendar is confirmed

the two of us who built it. sod installation includes soil preparation, rolling, initial watering guidance, and one establishment inspection. continuing mowing, feeding, edging, deadheading, seasonal cutback, and garden care are offered under this separate maintenance agreement.

10:40 pm

NO. 10 — ONE SIGNATURE

it starts with a walk of your land.

approval of this proposal authorizes the final site measure, supplier confirmations, permit review, and preparation of the written construction agreement. construction begins only after the final agreement is signed by both parties.

payment follows the final agreement, not this page: forty percent upon signing ($24,600) · fifty percent at substantial completion ($30,750) · ten percent after the final walkthrough and completion of documented punch-list work ($6,150). warranties, insurance documentation, the change-order procedure, and any applicable cancellation notice appear in that written agreement. no payment is collected through this proposal page.

11:58 pm

NO. 11 — THE LAST LOG

THE GARDEN, AFTER DARK — LIVING PHOTOGRAPH

friday evening. saturday morning. sunday afternoon.
a hundred small moments in between.
the project was never the pool. it was never even the fire.
the project was making room for those moments.

THE LONG WEEKEND
IN FIVE YEARS

the hydrangeas will be larger. the stone more worn. the steel darker.
the barn exactly the same.
the best projects never announce themselves. they simply become impossible to imagine the place without.